Project name: | House Refuse Incineration Power Plant Project in Ninghua Country Town.China |
Project owner: | Sanming Jinyuan Environment and New Energy Co.,ltd. |
Project Scale: | refuse/waste handling capacity 500t/day, the project plan to set up refuse/waste incineration power plant with 400t/day, equipped with 1 set 10MW Steam turbine generator, the whole installation can achieve efficient working time≥8000 hours. |
Incineration quantity: | 1 set |
Incineration furnace handling capacity: | 400t/day |
Steam turbine rated power: | 10MW/set |
Steam turbine quantity: | 1 set |
Rated running time | ≥8000 hours |
Service life | ≥ 30 years |
Item | Specification | |
quantity | : | 2 set |
Layout | : | single layer rail |
crane mode | : | semi-automated double girder hydraulic grab crane |
service life | : | ≥30 years |
lifting capacity | : | ≥11t |
overload capacity | : | ≥20% |
Min.running time | : | ≥8000 hours/year |
total inciration capacity | : | 440t/day |
working class | : | A8 |
wire rope material | : | galvanizing |
lifting speed | : | ≤45m/min |
lowering speed | : | ≤60m/min |
cross travel speed | : | ≤60m/min |
long travel speed | : | ≤65m/min |
electric protection class | : | IP55 |
insulation class | : | F |
grab volume | : | 6.3M3 |
control mode | : | manual + semi-automated |